65 MW
Total power capacity
Gross capacity, with potential expansion to 100 MW.
High-density AI Infrastructure powered by efficient energy systems. 99.99995% Fingrid uptime on record and excellent PUE and scalability outlook ready to deploy in Kemi, Finland.
100MW
Total Power Capacity
80+MW
Target PUE
1.20
PUE hottest months
20,496sqm
220,617.11 sqf
100MW
Max Power Capacity
$6,000/KW
NRC
Power & energy infrastructure
KEMIFN01 is a power-and-shell-ready, reliable hybrid nuclear and hydropower source with a record- breaking utility uptime record. The shell includes is a large 20,496 sqm (gross), 220,617.11 sqf (gross) that will hold 7 data halls (shell within a shell) in the planned retrofit, and all the redundancy, generation and cooling equipment.
The critical infrastructure is designed to support enterprise-grade AI workloads.
65 MW
Gross capacity, with potential expansion to 100 MW.
N+1
Concurrent maintainability with backup power systems.
12–24 h
Planned generator backup with UPS support.
110 kV
Access to the local industrial substation network.

Strategic location
Located in Kemi, Finland, the facility benefits from established industrial infrastructure, access to high-voltage power, and proximity to district heating networks.
Its location supports AI computing, hydrogen production, P2X, and other energy-intensive applications.
Coordinates: 65°41’28.5″N 24°36’46.9″E
Key Facts:
Technical specifications
Facility type
Power and shell
Total power capacity
65 MW gross
Expansion potential
Up to 100 MW
Data halls
7
Facility footprint
20,496 m² gross
Land area
~2.5 ha
Power redundancy
N+1
Rack density
Up to 130 kW
Cooling
Liquid and air cooling
Connectivity
Carrier-neutral
ISP Partners
Omonia, URL: omonia.com | 84 Grams, URL: 84grams.se
Built for next-generation AI
Phase 1 (Q3 2026): 70 MW energized power status.
Phase 2 (Q1 2027 / Jan 2027): 100 MW full site capacity (80 MW IT load + 20 MW cooling/auxiliary at PUE 1.20).
Future Scaling: Dedicated 110 kV line enabling expansion up to 200 MW overall site capacity.
Supports AI computing, hydrogen production, P2X, and other energy-intensive applications.
100% Clean Grid
Hybrid nuclear and hydropower supply
District Heat Reuse
Waste heat redirected to Rytikari homes
Industrial Synergies
Ready for hydrogen, P2X and bioindustries
Zero Evaporative Water
Water-free closed-loop dry cooling
Facility gallery
Purpose-built to support high-density AI workloads, the Kemi facility combines advanced cooling infrastructure, scalable deployment capabilities, and support for next-generation GPU architectures.
Build What AI Demands. From modular deployments to fully integrated AI factories, Uvation helps organizations turn infrastructure strategy into scalable AI capacity.