One single, integrated system:
Each AI factory aligns power, land, facilities, and GPU infrastructure under a single, scalable, vertically integrated delivery model.
Designed for large-scale AI workloads:
Every factory is optimized so you can train, fine-tune, and serve frontier models without re-architecting core infrastructure.
Deployment for any roadmap:
All Uvation AI factories provide standardized building blocks that follow your AI roadmap across regions and use cases.

Uvation AI factories come in three configurations. Expand from one site to a distributed footprint with consistent operations.

Asset Modernization:
The campus anchor
High-density facilities integrate into existing or new-build data center campuses where power, fiber, and long-term workloads converge. Anchor sovereign AI, enterprise, and government programs that need hardened environments and predictable capacity.
Key Specs:
* 80kW+ per rack capacity.
6–12 month implementation.
19–23% TCO reduction.
KDM Value:
Maximum utilization of existing CapEx.

Rapid Deployment:
The rapid deployer
Containerized, repeatable units ship as standardized blocks of power, cooling, and GPU for regional expansion or burst capacity. Stand up training and inference environments quickly, even in constrained or emerging markets.
Key Specs:
* 4–8 week deployment on Earth.
120kW+ per rack support.
Certified for extreme climates & orbital vibrations.
KDM Value:
Extreme speed-to-market and geographic flexibility.

The Ultimate Strategic Asset:
The grid-independent platform
These future-ready sites pair GPU-dense compute with dedicated, behind-the-meter power systems to reduce grid dependency and energy volatility and meet power, sovereignty, or security requirements.
Key Specs:
* 1 MW Carbon-Free Baseload
Locked $0.07/kWh energy rate for 15 years.
99.999% uptime (Independent of Grid).
KDM Value:
Immunity to energy inflation and geopolitical grid disruption.
| Metrics | Traditional | Modular | Autonomous |
|---|---|---|---|
| Grid Independence | 0% | 20% ( Backup) | 100% ( Sovereign) |
| Energy Rate | Variable Market | Industrial Tier | Fixed $ 0.07/kwh |
| Time to Market | 6-12 Months | 8 Weeks | 12-18 Months |
| Operational Life | 5-7 Years | 10-15 Years | 15-30 Years |
| Deployment Suitability | Urban Office | Edge/Orbit | Off-Grid/ Smart Cities |
We coordinate planning across power, networking, and compute for fewer handoffs, fewer unknowns, and faster critical decisions
Integrated planning with renewables today and planned nuclear power tomo